Davidson Wood Phase 2



Project Status

Construction drawings were approved in December 2021.

Recent Updates

Construction should begin in early Summer 2022. Construction traffic will follow the route shown below.

Davidson Woods Phs2
  1. Site Info
  2. Documents
  3. Contact

Site Info

  • Planning Area: Neighborhood General
  • Project Location: Davidson Hall Phase 2 is located at the southern terminus of Samuel Spencer Parkway
  • Parcel ID: 00709102
  • Acres: 32 +-
  • Development Description: A continuation of Davidson Wood Phase I, this is a single-family residential phase including 41 homes on 32 acres, with 14.21 acres of preserved open space (40% of site). Roadway connections are via Samuel Spencer Parkway, Park Terrace Lane and Bradford Park Drive. A greenway connection will also be provided to the Kincaid Trail from this phase of development.
  • Developer: Bowman Development Group